Today’s field call

Concrete weather in Des Moines today

Concrete is all about the pour and the cure — rain during placement, plastic-shrinkage cracking in hot dry wind, and a freeze before it sets are the three ways weather ruins a slab.

Limited

Use caution for concrete across Des Moines today — rain during cure (largely set). Worth a real check.

Des Moines metro-wide · your exact area can run different

Cure-window call: it can be clear on the ground right now and still be a no-go — the work needs dry, settled weather through the cure window, so rain moving in later today or tonight rules it out.

7aLim
8aLim
9aLim
10aLim
11aLim
12pLim
1pLim
2pLim
3pLim
4pLim

Hour-by-hour, work hours. = workable, precaution applies.

High87°Gusts16 mph

Forecast refreshed each morning.

All 6 spots we forecast in Des Moines

LocationTodayWhy & rain odds
Central metro
Downtown Des MoinesLimitedrain during cure (largely set)
West Des MoinesLimitedrain during cure (largely set)
Altoona / Pleasant HillLimitedrain during the critical cure window
North metro
AnkenyLimitedrain during the critical cure window
Johnston / UrbandaleLimitedrain during cure (largely set)
South metro
IndianolaLimitedrain during cure (largely set)

Chance = odds, over work hours, of rain heavy enough to disrupt a concrete day. Not recommended is our call, not a rule — the risk to the work is real, so we'd wait; limited means it's workable with care. Either way it's your crew, so check the sky and radar before you commit.

This is today's snapshot. The next 7 days for your area — the closest point we forecast to your ZIP, with the reasons behind every caution and stop, refreshed each morning — are what the free Sunday brief delivers.

What's driving the today call

What's limiting work

  1. rain during cure (largely set)
  2. rain during the critical cure window

Precautions & technique

  • evaporation at the action line — plan fog spray, esp. blended cements

Forecast-derived estimate, not a live sensor reading.

What the temperature means for concrete today

Today's 87° high is about normal for July (a 85° typical). See the breakdown above for what's driving the call today.

Source≈10-yr ERA5 reanalysis (Open-Meteo), 2015–2024

Get the full 7-day concrete plan for your ZIP

Your area's likely workdays, caution windows, and weather stops — with the reasons — before you schedule the crew.

Next 7 days, Des Moines-wide

FriLim
SatOK
SunGood
MonOK
TueOK
WedLim
ThuLim

This is the metro-wide shape. The free Sunday brief pins each day to the area we forecast nearest your ZIP — with the reasons behind every caution and stop — for every trade you run.

What controls a concrete day in Des Moines

Around Des Moines, the concrete calendar tracks the weather more than the date — Des Moines sees cold freeze-thaw winters and warm, humid summers. Hot, dry, windy stretches are when to watch plastic-shrinkage cracking, and if it turns cold, cold-weather protection comes in.

FactorWhy it mattersType & source
Rain during placement & set
Rain while placing and before the surface sets marks and weakens the finish. We flag a rain chance around 50% and call it off when a real rain is likely during the pour.
Hard stopACI 301 placement/protection guidance (the rain-chance line is our conservative call).
Evaporation (hot, dry, windy)
Hot, dry, windy air pulls water out of fresh concrete and causes plastic-shrinkage cracking. We compute the ACI 305R evaporation rate — about 0.1 lb/ft²/hr is a plan-fogging/wind-break precaution, 0.2 is a stop.
Hard stopACI 305R nomograph (Uno 1998 formula).
Cold & an early freeze
Below about 40°F, cure slows and ACI cold-weather protection (blankets, heated enclosures) applies — it's a protect-the-pour trigger, not an automatic stop. A freeze within roughly 48 hours, before the concrete reaches strength, is the real risk.
Hard stopACI 306R-16 §1.1 (40°F protection trigger) & §3.1a (~500 psi before first freeze).
Heat (crew safety)
OSHA heat-index bands (91°F precautions, 103°F stop) for the crew placing and finishing.
Crew / siteOSHA heat guidance.

Most of these thresholds trace to the manufacturer specs and industry standards cited above; where no published number exists, we use a clearly-labeled conservative cutoff. Either way the physics is the same anywhere. What's specific to Des Moines is when they line up, which is exactly what the live area-by-area call at the top of this page tracks each day.

When concrete gets tricky in Des Moines

The wettest stretch here is typically May — the hardest time to line up a dry concrete cure window. And from Dec–Feb, average highs sit near or below 40°F — cold-weather protection (blankets, heat) becomes the norm, and an early freeze can undo a fresh pour. Source ≈10-yr ERA5 reanalysis (Open-Meteo), 2015–2024

Common questions

How cold is too cold to pour concrete in Des Moines?

Below about 40°F, ACI 306R cold-weather protection applies (blankets, heated enclosures) and cure slows sharply — that's a protect-the-pour trigger, not an automatic stop. The real danger is a freeze within roughly 48 hours, before the concrete reaches about 500 psi. Our call flags both the cold and an early freeze in the cure window.

Can you pour concrete before rain in Des Moines?

Rain during placement or before the surface has set marks and weakens it (ACI 301). Plan a dry window through placement and initial set — our daily call flags rain across the pour and the cure horizon.

What is the evaporation-rate warning for concrete?

Hot, dry, windy conditions pull water out of fresh concrete and cause plastic-shrinkage cracking. We compute the ACI 305R evaporation rate: around 0.1 lb/ft²/hr we flag fogging and wind-break precautions, and at 0.2 we'd wait.